Products


Many in the industry are aware of the challenges with utilizing the space as efficiently as possible. Tight event calendars require lean operations when it comes to planning, producing, moving in, running the show, moving out and tearing down, keeping the lead times as short as possible. The marking of the stand positions, before actual production starts, is often performed during night or at other odd hours and typically under stress. Traditionally the marking is carried out manually with tape and a long tape measurer. It is a very tedious and boring job, also very time- and labour consuming and therefore a costly operation.Our robot based system, transforms these challenges into an effective, sustainable and cost saving operation using modern technology.

(Click on the image for more information about the project)